Engineering: compliant to PED

  • Detail engineering and thermal calculations based on final process data and isometric drawings at order award phase.
  • Optimized heating medium routing specifying the supply and return locations as well as the manifold locations.
  • Calculation of steam consumption (for steam supplied systems).
  • Installation drawings of the ThermEx Thermal Maintenance System.
  • The ThermEx Thermal Maintenance System will be designed , classified and manufactured compliant to PED.